Rehabilitation Cost Lens
What might your
rehabilitation cost?
An order-of-magnitude estimator for Western Australian mine rehabilitation, calibrated to Collie, Pilbara, Goldfields and Mid-West conditions. For planning conversations only — not a quote.
01 — Site
Area & region
Disturbance area
25 ha
1 ha100 ha250 ha500 ha
Region
02 — Landform
Reshaping required
Slope category
03 — Materials
Substrate & topsoil logistics
Substrate type
Topsoil haul distance
04 — Outcome
Post-mining land use
Target end use
Indicative estimate
$0 — $0
≈ $0 – $0 per hectare | 25 ha disturbance
ⓘ Order-of-Magnitude Only
Cost ranges are indicative and intended for early planning, feasibility, and closure-cost provisioning conversations.- Included: earthworks, topsoil placement, soil amelioration, revegetation, 5-year monitoring.
- Excluded: infrastructure demolition, pit-void treatment, groundwater works, tailings capping, contingency.
- Site-specific factors (PAF, water management, access, dewatering) can materially shift the range.
Estimator methodology. Ranges reflect typical WA mine
rehabilitation activities and are aligned with the
DEMIRS Guideline for Preparing Mine Closure Plans (Sept 2025)
cost-estimation expectations. Calibrated to public benchmarks and
GMA project experience in Collie and the Pilbara. Always provide a
site-specific quote after site walk-down and review of closure plan
completion criteria.
© Green Mines Australia | A trading name of Amalgamated Civil Plant Hire Pty Ltd | ABN 99 631 049 388